Clifton Dr. 16” Sanitary Sewer Relocation (Design-Build)
This Progressive Design Build Project consists of the relocation of the existing 16” sewer main from the creek bank to the middle of a residential street to prevent the possibility of damage to the sewer from stream bank erosion. The project included the installation of 16” DIP gravity sewer up to 23 ft deep, 173 lf of 8” DIP gravity sewer, installation / relocation of 20 ea. sewer laterals, upgrade 22 ea. water services, abandon existing 16” gravity sewer using flowable fill, and complete re-build of the road pavement structure.
Contract GMP – $3 Million
Contract VE Value – $3 Million
Contract Duration – 27 Months
Completion – August 2020
Engineer – Mckim & Creed