Harnett WWTP Project
The scope of this project consisted of modifications to the Harnett County North Regional Waste Water Treatment Plant: Scope included construction of a sludge dewatering system for water sludge and wastewater sludge including sludge dredge, storage tanks and mixers, pumps, centrifuges, and sludge storage building. Installation of mixers in the existing oxidation ditch and installation of new stainless steel disk tertiary filters to replace one existing traveling bridge filter. The project also included the construction of a deep filter drain at the low lift pump station storage reservoir located at the Harnett County WTP
Contract Bid – $10.2 Million
Contract VE Value – $10.2 Million
Contract Duration – 12 Months
Completion – June 2020
Engineer – MBD Consulting Engineers