NATURAL GAS
Construction, Maintenance, and Repair of Natural Gas Distribution Systems
Natural Gas Distribution
State Utility Contractors provides construction, maintenance, and repair services for underground natural gas distribution systems throughout the Charlotte metropolitan area and surrounding communities in North Carolina and South Carolina. We work with municipal gas departments, public utilities, and private operators to maintain existing infrastructure, respond to damaged lines and leaks, and support system improvements and expansion.

Supporting York County's Gas Distribution System
State Utility Contractors provides ongoing maintenance and repair services for York County Natural Gas Authority. Our crews handle daily work orders, repair leaks and damaged lines, replace aging infrastructure, and respond to emergency calls.
What We Do
Maintenance and Repair
Aging infrastructure, third-party damage, and public works projects create ongoing maintenance and repair needs. Crews perform routine work orders and respond to urgent calls on existing gas distribution systems.
- Leak and damaged line repairs using mechanical clamps, electrofusion, and compression fittings
- Emergency response to gas leaks and damaged lines
- Replacement of aging steel and polyethylene mains and services
- Gas line relocations for highway, public works, and development projects
- Locating and repairing difficult-to-find underground gas lines
New Construction and Installation
New development and system expansion require gas mains and services built to utility standards and connected to existing infrastructure.
- Medium-density polyethylene (MDPE) and coated steel gas mains and service lines
- Service tie-ins and connections to active mains
- Service taps, risers, valves, and casings
- Open trench installation
- Horizontal directional drilling (HDD) and boring under roads, driveways, and rights-of-way
Every job ends with testing and restoration
Safety and Qualifications

Operator Qualification (OQ)
Energy WorldNet (EWN)
Field crews complete task-specific evaluations through EWN and maintain qualifications in accordance with each utility's OQ plan.
Drug and Alcohol Program
PHMSA and DOT | 49 CFR Parts 199 and 40
Our drug and alcohol testing program follows federal requirements for employees who perform covered functions on natural gas pipelines.
811 Damage Prevention
NC 811 and SC 811
Before excavation, crews submit locate requests, verify responses and markings, and use protective excavation methods near existing underground utilities.

© Copyright 2026 State Utility Contractors. All Rights Reserved.